Illustrative estate
Twelve buildings. One estate.
198,100 m² GIA. Leaf is inside the allowance, mist recovers by 2050, coral is still stranded. The model above is drawn in the page, so it is there before any extra graphics load.
UK-wide
Commercial property
Office · EPC D · 18,400 m²
Ashlar House
Still stranded
2026
40.2 kg/m²
739 tCO₂e
2050 on this plan
19.8 kg/m²
364 tCO₂e
2026 allowance
34.0 kg/m²
2050 allowance
12.0 kg/m²
Gas-led office. Grid decarbonisation alone does not bring it inside. A heat-source change does.
20262050
Pathway lab
Turn a plan on. Watch the estate change colour.
Four generic levers, phased across the same twelve buildings. Fossil heat does not follow the grid. Electricity does. Annex Block and Bay Works are there to show the limit.
From 2027
Controls and BMS
Schedules, set-points and metering. A small cut on both fuels from the year it is commissioned.
From 2029
Fabric and glazing
Insulation, airtightness and solar control, taken before the heating plant is replaced.
From 2030
Roof photovoltaics
Generation sized to a plausible roof, not to the whole electrical load. It cannot go below zero import.
From 2031
Heat decarbonisation
The share of fossil heat that can move, moves to a heat pump. What cannot move stays on the fossil factor.
Portfolio
Area
198k m²
2026 intensity
27 kg
2050 plan
12 kg
2050 no works
12 kg
Solid line is intensity. Dashed line is the allowance. The leaf marker is 2026.
At 2026, 4 of 12 are inside, 4 recover by 2050, and 4 are still stranded. By 2050 on this plan, 8 are inside and 4 remain stranded. Portfolio emissions move from 5,308 tCO₂e in 2026 to 2,468 tCO₂e in 2050. The area-weighted average is inside the allowance.
Consultant read
At 2026, 4 of 12 buildings are inside the allowance, 4 are over this year but recover by 2050, and 4 are still stranded on this plan. Portfolio intensity is 26.8 kgCO₂e/m² against an area-weighted allowance of 28.6.
The portfolio average is inside the allowance. Ashlar House, Bay Works, Annex Block and Pallet Depot are not. That is the fund-level mistake: aggregating the estate until the stranded asset disappears.
Ashlar House, Bay Works, Annex Block and Pallet Depot are still outside the 2050 allowance with these levers on. A lever list is not a whole-building design. Those assets need a surveyed pathway, checked evidence, and a view of what can actually be commissioned.
5 assets are EPC D or E. Today’s non-domestic MEES letting floor is E. A tighter standard is still only a proposal: the June 2026 consultation proposes EPC B from 2031 for buildings over 1,000 m². We would not put it in a board pack as settled law.
Assumptions, kept visible
Electricity factor: 0.207 kgCO₂e/kWh in 2026, in a straight line to 0.022 in 2050. Illustrative. Not a DESNZ table.
Fossil heat: 0.183 kgCO₂e/kWh, held flat. Fossil does not follow the grid.
Controls from 2027: electricity −8%, fossil heat −6%.
Fabric from 2029: electricity −4%, fossil heat −16%.
Roof generation from 2030: a fixed kWh/m² taken off electricity, never below zero.
Heat pump from 2031: the stated movable share of remaining fossil heat, divided by the stated COP, added to electricity.
Allowance: a straight line from each asset’s 2026 figure to its 2050 figure. Not an official CRREM pathway and not a design target we would sign.
Levers do not rewrite 2026. Nothing commissions before its year.
What the consultancy delivers
The model is a way into the conversation. The work is the evidence, the audit and the pathway a board can stand behind.
UK NZCBS support
Readiness and gap assessment, evidence collation, and landlord or tenant route structuring ahead of independent verification.
Net zero carbon reports
Asset and portfolio pathways set against UKGBC framing and a CRREM-style stranding read, with the assumptions left on the page.
ESOS Lead Assessor
Phase 4 qualification, energy audits and action plans. The Phase 4 qualification date is 31 December 2026.
CRREM analysis
Stranding risk at asset and fund level, so a comfortable portfolio average cannot hide a building that misses the pathway.
Commercial EPCs and MEES
Non-domestic certificates for sale, letting and today’s EPC E floor, plus a sober read of what is still only proposed for 2031.
Energy audits
Building-level measures with an investment-grade view of cost and carbon, not a generic lever applied to every roof.
Embodied carbon
Whole life carbon to RICS WLCA for new build and refurbishment, where operational savings must not be bought with a carbon-heavy kit.
ESG, SECR and GHG
Scope 1, 2 and 3, dual Scope 2, SECR narratives, and alignment notes for GRESB and TCFD.
Who we work with
Landlords and investors
MEES, microgeneration and asset performance, read building by building so a letting risk is not averaged away.